Appendix A. FEE SCHEDULE
FEE SCHEDULE
This appendix includes all fees and charges established by the city commission that are referred to in the indicated sections of the Code of Ordinances:
Section
this CodeDescription
Amount
Subpart A. General Ordinances Chapter 2. Administration Article V. Finance 2-277 Fee for dishonored checks $20.00 Or 5% of face amount of check Article VII. Standards of Conduct Division 3. Lobbyists 2-482(a) Registration fee 25.00 2-482(f) Biennial registration 125.00 Chapter 14. Building Regulations Part I Article II. Construction Standards Division 1. Generally 14-33(b) Delinquency penalty for violation of article: First month, 10% Subsequent months, 5% 14-37 Hearing requested by aggrieved owner/applicant for denial of certificate of use, determination of fees/penalties due, and/or warning of potential suspension/revocation 75.00 Division 2. Permit Fees 14-61(b) Double fees for starting work prior to issuance of permit, plus the following penalty: First offense $500.00 Second offense 1,000.00 Subsequent offenses 2,000.00 14-61(c)(1) Reinspection fee: In compliance with F.S § 553.80(2)(c), any subsequent reinspection after the first reinspection shall be charged 200.00 Second and subsequent reinspection(s) 200.00 14-61(d) Lost plans fee: Administrative processing fee 50.00 Plus the cost per page reproduced: • Letter (8½ × 11), Legal (8½ × 14), single-sided, per page 0.15 • Letter (8½ × 11), double-sided, per page 0.20 • Certified documents (letter or legal) 1.00 Documents on Compact Discs (CDs) 3.00 Reproduction of documents beyond legal At cost to City 14-61(e) Revised plans processing fee: Commercial minor revisions up to 35 pages 500.00 Commercial major revisions over 35 pages 20.00 per page Commercial total revision when determined by the building official 50% of Original Permit Fee Residential minor revision up to 15 pages 200.00 Residential major revision over 15 pages 20.00 per page Residential total revision when determined by the building official 50% of Original Permit Fee Administrative processing fee 50.00 14-61(f) Lost permit card, Fee per required signature 80.00 14-61(g) Inspection fee hourly rate: The inspection fee hourly rate is calculated at the beginning of each fiscal year based on the department's approved budget, overhead and indirect costs and the resources assigned to the inspection program 14-61(h) Plans re-review fee: First and second re-review 0.00 Plans re-review fee. Pursuant to the Florida Building Commission, and in compliance with F.S. § 553.80(2)(b), when extra plans reviews are due to the failure to correct code rejections specifically and continuously noted in each rejection, each time after the third such review that plans are rejected for the same code rejections, a fee of $250.00 per discipline shall be attributed to plans review 14-61(i) Expedited plan review and inspection fee: Upon request from the applicant, the department may schedule an expedited plans review by department staff. Fee for each review or category requested 250.00 14-61(n) Phase permits: Commercial new construction 5,000.00 Commercial alteration 4,000.00 Residential new construction
Single-family residence2,000.00 14-61(p) Photovoltaic fees 0.00 14-62(a) Up-front processing fee: Percent of estimated permit fee or the minimum processing fee, whichever is greater Percent of estimated permit fee rounded up to the nearest $5.00 increment 20% Minimum up-front fee 50.00 14-62(b)(4) Change of contractor 100.00 14-62(b)(4) Change of architect or engineer 100.00 14-62(b)(6) One time request for building permit extension (permit must not be expired) 100.00 14-62(b)(6) Additional request for building permit extension (permit must not be expired): Percent of building permit fee line item only 50% 14-62(b)(7) New or renewed permits for expired, revoked and nullified or voided permits 25% of original permit fee 14-62(b)(7) Processing fee 100.00 14-62(c) Building permit fees: Minimum permit fee 100.00 Commercial Permit Fees for Building Permits: New construction minimum fee 140.00 Alterations minimum permit fee 100.00 Permit fee for a building whose estimated construction cost is equal to or less than $35 million is 1.9% of the cost of construction as approved by the building official or his or her designee, plus 1.0% of the construction cost for any amount over $35 million but less than or equal to $100 million; and 0.25% of costs exceeding $100 million as approved by the building official or his or her designee Due to hurricane events, fees for minor repairs under a total value of $20,000, the above fee (14-62(c)] shall be reduced by 40% for the following period: Three months from the hurricane event to pull permit. This does not apply to any permits needed for railing repairs and all repairs must be of a substantially similar design, quality and appearance. Residential Permit Fees for Building Permits New construction minimum permit fee 120.00 Alterations minimum permit fee 90.00 Residential: Single-family, Duplex:
Permit fee for a building whose estimated construction cost is equal to or less than $1.5 million is 1.7% of the cost of construction as approved by the building official or his or her designee, plus 1.0% of the construction cost for any amount over $1.5 million as approved by the building official or his or her designeeDue to hurricane events, fees for minor repairs under a total value of $20,000, the above fee (14-62(c)] shall be reduced by 40% for the following period: Three months from the hurricane event to pull permit. This does not apply to any permits needed for railing repairs and all repairs must be of a substantially similar design, quality and appearance. Temporary and Special Event Fees Temporary platforms for public assembly, first approval 150.00 Temporary bleachers for public assembly, first approval 150.00 Temporary platforms or bleachers for public assembly, re-approval 100.00 Tents excluding electric and plumbing, per tent • Up to 1,000 square feet 150.00 • Each additional 1,000 square feet over 1,000 50.00 Temporary structure/trusses/statues (no electrical or plumbing included) 150.00 Temporary chiller 500.00 Temporary generator 500.00 Construction trailer, per trailer 500.00 Office trailer, per trailer 500.00 Temporary power for construction 300.00 Temporary power for test 200.00 Temporary multiseat toilet trailer, per trailer 100.00 Temporary individual toilet, per event 50.00 Temporary fencing 150.00 Electrical installation - Small events (1—10 tents, bleachers, stages and other structures) 250.00 Electrical installation - Large events (more than 10 tents, bleachers, stages and other structures) 500.00 Mechanical installation - Small events (1—10 tents, bleachers, stages and other structures) 250.00 Mechanical installation - Large events (more than 10 tents, bleachers, stages and other structures) 500.00 Plumbing installation - Small events (1—10 tents, bleachers, stages and other structures) 250.00 Plumbing installation - Large events (more than 10 tents, bleachers, stages and other structures) 500.00 14-63 Plumbing permit fees: Minimum plumbing permit fee 100.00 This minimum does not apply to permits issued as supplementary to current outstanding permits for the same job Commercial Permit Fees for Plumbing Permits Permit fee for a building whose estimated construction cost is equal to or less than $30 million is 2.0% of the cost of construction as approved by the building official or his designee, plus 1.0% of the construction cost for any amount over $30 million as approved by the building official or his designee Residential Permit Fees for Plumbing Permits Residential: Single-family, Duplex:
Permit fee for a building whose estimated construction cost is equal to or less than $1 million is 1.8% of the cost of construction as approved by the building official or his designee, plus 1.0% of the construction cost for any amount over $1 million as approved by the building official or his designee14-64 Electrical permit fees: Minimum electrical permit fee: This minimum does not apply to permits issued as supplementary to current outstanding permits for the same job 100.00 Commercial Permit Fees for Electrical Permits Permit fee for a building whose estimated construction cost is equal to or less than $30 million is 2.0% of the cost of construction as approved by the building official or his designee, plus 1.0% of the construction cost for any amount over $30 million as approved by the building official or his designee Residential Permit Fees for Electrical Permits Residential: Single-family, Duplex:
Permit fee for a building whose estimated construction cost is equal to or less than $1 million is 1.8% of the cost of construction as approved by the building official or his designee, plus 1.0% of the construction cost for any amount over $1 million as approved by the building official or his designee14-65 Mechanical permit fees: Minimum mechanical permit fee. This minimum does not apply to permits issued as supplementary to current outstanding permits for the same job 100.00 Commercial Permit Fees for Mechanical Permits Permit fee for a building whose estimated construction cost is equal to or less than $30 million is 2.0% of the cost of construction as approved by the building official or his designee, plus 1.0% of the construction cost for any amount over $30 million as approved by the building official or his designee Residential Permit Fees for Mechanical Permits Residential: Single-family, Duplex:
Permit fee for a building whose estimated construction cost is equal to or less than $1 million is 1.8% of the cost of construction as approved by the building official or his designee, plus 1.0% of the construction cost for any amount over $1 million as approved by the building official or his designeeSmoke control test • Up to 10,000 square feet 200.00 • 10,000 to 50,000 square feet 500.00 • Over 50,000 square feet 1,000.00 Elevators, escalators and other lifting apparatus: Permit for new installation or major revamping per ASME A17.1 Section 8.7 Building permit required (includes initial inspection and certificate) Installation of traction elevators and escalators, per unit • Up to three stories 2,662.00 • 3—10 stories 3,246.00 • Each additional story over 10 101.00 Installation of hydraulic elevator, per unit • Up to three stories 1,385.00 • 3—10 stories 1,762.00 Installation of escalator, per unit 2,590.00 Installation of parking lifts, per unit 240.00 Installation of robotic parking, per apparatus 3,600.00 Installation of residential elevator, per unit 1,456.00 Installation of wheelchair lift, chair stairs and dumbwaiter 1,171.00 Elevator Repair and Maintenance Annual maintenance repair permit (not to include major revamping) 722.00 Repairs (value over $5,000.00) per ASME 17.1, Section 8.62 760.00 Repairs (jack/oil lines) up to $5,000.00 300.00 Repairs (can interior/other) up to $5,000.00 300.00 Roof window cleaning machine, each machine 130.00 Permit for removal of elevator from service 684.00 Elevator tests, temporary use, variances and compliance inspections: Emergency power test 1,301.00 Elevator fire recall test, per unit 1,226.00 Temporary use permit (must be renewed every 30 days) 1,580.00 Temporary use renewal 120.00 Application for variances from codes to install or modernize equipment 623.00 Annual fees for certificate of operation and inspection Certificate of operation for each unit (mandated) 90.00 Renewal of delinquent certificate of operation 120.00 Duplicate certificate of operation (mandated) 30.00 Dumbwaiters, elevators and escalators — Certificate and inspection: Monitoring/jurisdictional fee 240.00 Reinspection fee, each reinspection 125.00 Compliance inspection if witnessed test failed, per inspection 125.00 Elevator and escalator renewal late fee 180.00 Elevator expired permit renewal fee 100.00 Elevator permit renewal processing fee 57.00 Expedited plan review and inspection fee. Upon request from the applicant, the department may schedule an expedited plans review or inspection on an overtime basis by department staff, per each review or inspection requested 250.00 Any elevator, escalator, etc., owner who fails to comply with the order to correct a violation issued within 30 days, is subject to an administrative fine up to $500.00 in addition to any other penalty provided by law. Fines can be imposed for every 30-day period that the violation remains active These fines, before or after paid, can be appealed to the department director whose decision shall be final. No clearance for the use of the elevator shall be given until these fines have been paid or waived Boilers and pressure vessels, installation permit fees, including initial inspections and certificate; does not include installation or connection of fuel and water lines: Boilers (as defined in the ASME Boiler and Pressure Vessel Code): Annual inspection for boilers 260.00 14-66(1) Certificate of occupancy fees: Residential units R-1, R-2, and R-3, per unit 150.00 All commercial occupancies except R-1 and R-2, per square foot 0.07 Minimum fee for commercial certificates of occupancy 250.00 When a temporary certificate of occupancy or completion has been issued and the fee has been paid, the fee for a final certificate of occupancy or completion 0.00 14-66(1) Temporary certificate of occupancy or completion fees: 100 percent of final certificate of occupancy or completion and letter of final completion fee plus the cost of any additional required inspections. Additional required inspections will be charge based on actual time spent on inspection multiplied 200.00 Extension of temporary certificate of occupancy or completion, per period as set by the building official. Percent of final certificate of occupancy or completion fee: 100% Forty-year recertification program fee: 14-67(a) Per building 600.00 Building official approval of 6-month extension for building recertifications 600.00 14-67(c) New inspection report fee if recertification not completed within 90 days of building's being declared unsafe 300.00 14-69 Employee training, education, safety, and technology procurement and implementation for service enhancement surcharge is 6 percent of each and every building permit fee 14-70 Other general fees 14-70(1) Pursuant to Florida Statutes § 553.721, in order for the department of business and professional regulation to administer the Florida Building Code, there is created a surcharge to be assessed at the rate of 1.5 percent of the permit fee associated with enforcement of the Florida Building Code. The minimum amount collected on any permit issued shall be $2.00 14-70(2) Pursuant to Miami-Dade County Ordinance 8-12(e), a surcharge to building permits for county code compliance program, per $1,000.00 of work valuation 0.60 14-70(3) Pursuant to Florida Statutes § 468.631, the building code administrator's and inspector's fund shall be funded through a surcharge to be assessed at the rate of 1.5 percent of all permit fees associated with enforcement of the Florida Building Code. The minimum amount collected on any permit issued shall be $2.00 14-70(5) Sanitation surcharge for all building, electrical, plumbing, mechanical demolition permits, 0.30 percent of estimated cost of project: Minimum 15.00 Maximum 1,500.00 14-70(6) A separate fire safety, public works and/or zoning review fee associated with the building permit process shall be charged as outlined in appendix A. See applicable department fee sections 14-72(1) Interest and collection fees shall be charged for unpaid amounts (fees) due 14-72(2) Documents. Requests for copies of building department records, inspection reports, logs, or similar documents maintained by the building department will be charged a fee as specified in subsection 14-61(d) of appendix A Planning Fees Associated with the Building Permit Process 15-31(a) Planning review fee for a commercial building permit shall be assessed at .70% of the cost of construction 15-31(a) Planning review fee for a residential building permit shall be assessed at .50% of the cost of construction 15-31(b) Double fees for work prior to issuance of permit, plus penalties shall be consistent with 14-61(b) 15-31(c)(1) Reinspection fees shall be consistent with subsection 14-61(c)(1) 15-31(d) Lost Plans fee shall be consistent with subsection 14-61(d). Planning shall not assess administrative processing fee 15-31(e) Revised Plan Review fee shall be consisted with subsection 14-61(e) 15-31(f) Lost Permit Card fee shall be consistent with subsection 14-61(f) 15-31(g) Inspection Fee hourly rate. As determined by the department at the beginning of each fiscal year 15-31(h) Plans re-review fee shall be consistent with subsection 14-61(h) 15-31(i) Expedited plans review and inspections in addition to all applicable fees: Expedited plans review (not to exceed 4 hours) 500.00 Expedited inspection 150.00 15-31(l) Annual Adjustment of rates. The rates pertaining to this division will administratively adjusted annually to reflect increase(s) or decrease(s) in the Consumer Price Index for all urban consumers, CPI-U 15-31(n) Phased Permit. If department review of Phase Permit application is required, a fee consistent with subsection 14-61(n) shall be assessed 15-32(a)(1), (2) Upfront Fee shall be consistent with subsection 14-62(a) 15-32(b) Refunds, time limitations, cancellations, change of contractors shall be processed and fees assessed consistent with subsection 14-62(b)(4), (5), (6), (7) 15-33 Certificate of occupancy or completion shall be processed and fees assessed consistent with subsection 14-66(1) 15-35 Employee training, education, safety and technology enhancements and other surcharge will be assessed consistent with subsection 14-69, 14-70(1), (2), (3), (5) as applicable 15-36(a) Interest and collection fees shall be charged for unpaid amounts (fees) due 15-36(b) Documents. Requests for copies of department records, inspection reports, logs, or other similar documents maintained by the department will be charged a fee consistent with subsection 14-61(d) Minimum Planning fee associated with a building permit 70.00 Other Planning and Zoning Department Fees Chapter 6. Alcoholic Beverages
Article I. In General6-2(a) Service charge for review of application for license 400.00 Section
this CodeDescription
Amount
(Effective October 15, 2012)
Chapter 42. Emergency Services Article II. Alarm Systems Division 3. Burglar Alarms 42-84(a) Renewal of alarm registration fee 10.00 Chapter 50. Fire Prevention and Protection 50-3(a) Fire review fee for a commercial building permit shall be assessed at .70% of the cost of construction 50-3(a) Fire review fee for a residential building permit shall be assessed at .50% of the cost of construction 50-3(b) Double Fees for work prior to issuance of a permit, plus penalties shall be consistent with subsection 14-61(b) 50-3(c)(1) Reinspection fees shall be consistent with subsection 14-61(c)(1) 15-3(d) Lost plans fee shall be consistent with subsection 14-61(d). Fire [Department] shall not assess administrative processing fee 50-3(e) Revised Plans Review fee shall be consisted with subsection 14-61(e) 50-3(f) Lost Permit Card Fee shall be consistent with subsection 14-61(f) 50-3(g) Inspection Fee hourly rate. As determined by the department at the beginning of each year 50-3(h) Plans re-review fee shall be consistent with subsection 14-61(h) 50-3(i) Expedited plans review and inspections in addition to all applicable fees Expedited plans review (not to exceed 4 hours) 500.00 Expedited inspection 150.00 50-3(l) Annual Adjustment of rates. The rates pertaining to this division will administratively adjusted annually to reflect increase(s) or decrease(s) in the Consumer Price Index for urban customers, CPI-U 50-3(n) Phased Permit. If department review of Phase Permit application is requested, a fee consistent with subsection 14-61(n) shall be assessed 50-3(p) Specialty Permits. Building: Temporary/special events permits Temporary structure/trusses/statues (not including tents, platforms or bleachers) 73.63 Temporary platforms for public assembly, first approval 181.48 Temporary bleachers for public assembly, first approval 165.92 Temporary platforms/bleachers for public assembly, re-approval 21.78 Tents up to 1,000 square feet per unit 137.92 Tents each additional 1,000 square feet over 1,000 per unit 38.37 Construction trailer, per trailer 140.00 Office trailer, per trailer 140.00 50-4(a)(1), (2) Upfront Fee shall be consistent with subsection 14-62(a) 50-4(b) Refunds, time limitations, cancellations, change of contractors shall be processed and fees assessed consistent with subsection 14-62(b)(4), (5), (6), (7) 50-5(1)(a), (b) Certificate of occupancy or completion shall be processed and fees assessed consistent with subsection 14-66(1). 50-7 Employee training, education, safety and technology enhancements and other surcharge will be assessed consistent with subsection 14-69, 14-70(1), (2), (3), (5), as applicable 50-8(b) Documents, Requests for copies of department records, inspection reports, logs or other similar documents maintained by the department will be charged a fee consistent with 14-61(d) 50-9 Interest and collection fees shall be charged for unpaid amounts (fees) due Minimum Fire fee associated with a building permit 70.00 50-10(a) Fire permits Sprinkler/standpipe systems based on area of work • Up to 2,500 square feet 591.09 • 2,501 to 3,000 square feet 642.94 • 3,001 to 5,000 square feet 741.96 • 5,001 to 10,000 square feet 1,014.19 • 10,001 to 15,000 square feet 1,111.66 • 15,001 to 30,000 square feet 1,508.84 • 30,001 to 75,000 square feet 2,696.20 • 75,001 to 100,000 square feet 3,959.27 • 100,001 to 150,000 square feet 5,641.28 • 150,001 to 500,000 square feet 16,778.66 • Over 500,001 square feet 19,773.52 Standpipe systems only (no sprinkler system) per 100 feet 249.92 Fire pump acceptance testing 295.55 Pressure reducing valve acceptance testing 829.60 Minor work on existing sprinkler system (1—5 components) 66.37 Minor work on existing sprinkler system (6—15 components) 208.44 Replace sprinkler heads (more than 15) • Up to 2,500 square feet 173.18 • 2,501 to 3,000 square feet 198.07 • 3,001 to 5,000 square feet 247.84 • 5,001 to 10,000 square feet 296.58 • 10,001 to 15,000 square feet 346.36 • 15,001 to 30,000 square feet 494.65 • 30,001 to 75,000 square feet 1,088.85 • 75,001 to 100,000 square feet 1,583.50 • 100,001 square feet and up 2,325.99 50-10(a) Fire alarm system based on area of work • Up to 2,500 square feet 311.10 • 2,501 to 3,000 square feet 368.14 • 3,001 to 5,000 square feet 419.99 • 5,001 to 10,000 square feet 565.17 • 10,001 to 15,000 square feet 615.98 • 15,001 to 30,000 square feet 765.31 • 30,001 to 75,000 square feet 1,161.44 • 75,001 to 100,000 square feet 1,534.76 • 100,001 to 150,000 square feet 2,447.32 • 150,001 to 500,000 square feet 7,201.97 • 500,001 to 1,000,000 square feet 8,783.39 • Repair and replace fire alarm panel only • Up to 2,500 78.81 • 2,501 to 3,000 78.81 • 3,001 to 5,000 94.37 • 5,001 to 10,000 108.89 • 10,001 to 15,000 108.89 • 15,001 to 30,000 138.96 • 30,001 to 75,000 198.07 • 75,001 to 100,000 405.47 • 100,001 to 150,000 474.95 • 150,001 to 500,000 1,474.61 • Over 500,000 1,712.09 Installation of new single station smoke detectors • Under 5 devices, minimum 103.70 • Up to 25 devices 466.65 • Per additional 25 devices beyond the initial 25 or fraction thereof, above fee plus 311.10 Minor work on existing fire alarm system (1—5 components) 40.44 Minor work on existing fire alarm system (6—15 components) 201.18 50-10(a) Fire suppression system. Localized suppression system (cooking hood, paint booth, etc.), per unit or system. Multiple systems in same area (i.e., kitchen) will be charged at 50% of above fee for each additional system 246.81 50-10(a) Fire suppression system. Room suppression system (computer hood, electrical rooms, etc.), per unit or system 642.94 Minor work on existing fire suppression system (1—5 components) 57.04 50-10(b) Hydrant flow test 244.00 50-10(c) Occupant content sign 244.00 50-10(d) Pyrotechnic display permit 218.00 50-10(e) Fireworks permit 322.00 50-10(f) Open burning permit 218.00 50-10(g) Bonfire permit 145.00 50-10(h) Special events fees: See subsection 50-3(p) 50-10(i) Trade shows (fee for event plans covering MBCC or similar facility hall area or part thereof) 150.00 50-10(j) Sidewalk cafes—Propane tank heaters per establishment 25.00 50-10(k) Special master cases 100.00 50-10(l) Documents. Requests for copies of department records, inspection reports, logs or other similar documents maintained by the department will be charged a fee consistent with subsection 14-61(d) 50-10(m) Annual Adjustment of rates. The rates pertaining to this division will administratively adjusted annually to reflect increase(s) or decrease(s) in the Consumer Price Index for urban consumers, CPI-U Section
this CodeDescription
Amount
Fees for the issuance of the fire safety permit and the annual renewal thereof. 50-12(a)—(e) Assembly occupancies: Class A—occupant load greater than 1,000 persons $115.00 Class B—occupant load greater than 300 but not greater than 1,000 persons 86.25 Class C—occupant load of 50 or more but not > 300 persons 57.50 Educational occupancies: Schools (private)—educational facilities inclusive of the first to the 12th grade: Buildings up to 10,000 square feet 57.50 Buildings greater than 10,000 square feet 57.50 Plus, for each additional 1,000 square feet 1.15 Nurseries, day care centers, kindergartens—educational facilities up to but not including the first grade 57.50 50-12(a)—(e) Health care occupancies: Private hospitals, nursing homes, limited care facilities: Up to 100 beds 143.75 Over 100 beds 143.75 Plus, per bed over 100 1.44 50-12(a)—(e) Residential occupancies: Apartment buildings: 3—11 dwelling units 57.50 12—50 dwelling units 80.50 Over 50 dwelling units 80.50 Plus, per unit over 50 2.30 Hotel, motel, dormitories, lodging house or rooming house: 3—50 rental sleeping units 80.50 Over 50 sleeping units 80.50 Plus, per unit over 50 2.30 Board and care facilities: Small facilities—not more than 16 residents 80.50 Large facilities—more than 16 residents 80.50 Plus, per unit over 16 2.30 50-12(a)—(e) Mercantile occupancies: Class A—all stores having an aggregate gross area of more than 30,000 square feet or utilizing more than three levels, excluding mezzanines, for sales purposes 86.25 Plus, 1,000 square feet over 30,000 square feet 1.15 Class B—all stores of more than 3,000 square feet but not more than 30,000 square feet aggregate gross area, or 86.25 utilizing floors above or below the street floor level for sales 86.25 Class C—all stores of not more than 3,000 square feet gross area used for sales purposes on one story only 57.50 50-12(a)—(e) Business occupancies: General offices, including doctors', dentists', and outpatient clinics (ambulatory): Up to 5,000 square feet 57.50 Over 5,000 square feet 57.50 Plus, for each additional 1,000 square feet 1.15 Colleges and university instructional buildings, classrooms under 50 persons and instructional laboratories 57.50 Plus, for each classroom 1.15 50-12(a)—(e) Industrial occupancies: General industrial occupancies—industrial operations conducted in buildings of conventional design suitable for various types of industrial processes; subject to possible use for types of industrial processes with high density of employee population: Up to 5,000 square feet 57.50 Over 5,000 square feet 57.50 Plus, for each additional 1,000 square feet 1.15 Special purpose industrial occupancies—industrial operations in buildings designed for and suitable only for particular types of operations, characterizes by a relatively low density of employee population, with much of the area occupied by machinery or equipment Up to 5,000 square feet 86.25 Over 5,000 square feet 86.25 Plus, for each additional 1,000 square feet 1.44 High hazard industrial occupancies—buildings having high hazard materials, processes, or contents: Up to 5,000 square feet 115.00 Over 5,000 square feet 115.00 Plus, for each additional 1,000 square feet 1.73 50-12(a)—(e) Storage occupancies: Low hazard contents—classified as those of such low combustibility that no self-propagating fire therein can occur 57.50 Ordinary hazard contents—classified as those that are likely to burn with moderate rapidity or to give off a considerable volume of smoke: Up to 10,000 square feet 86.25 Over 10,000 square feet 86.25 Plus, for each additional 2,000 square feet 1.15 High hazard contents—classified as those that are likely to burn with extreme rapidity or from which explosions are likely: Up to 5,000 square feet 115.00 Over 5,000 square feet 115.00 Plus, for each additional 1,000 square feet 1.15 50-12(a)—(e) Marinas: 3 to 12 boat slips 57.50 13 to 50 boat slips 115.00 Over 50 boat slips 115.00 Plus, per slip over 50 1.73 50-12(a)—(e) Hazardous material permit fee 150.00 Late permit fee, after 30 days 250.00 Late permit fee, after 90 days 500.00 50-12(a)—(e) Placard fee for hazardous materials 50.00 Chapter 58. Housing Article III. Property Maintenance Standards Division 2. Administration Subdivision II. City Manager's Designee 58-233 Appeals from actions or decisions of city manager's designee 250.00 Chapter 66. Marine Structures, Facilities and Vehicles Article III. Piers, Docks and Boat Ramps 66-114(a) Plans review fee shall be consistent with subsection 14-61(h). Up-front processing fee shall be consistent with subsection 14-62(a) 66-114(b) Reinspection fees shall be consistent with subsection 14-61(c)(1) Chapter 74. Peddlers and Solicitors Article II. Charitable Solicitations Division 2. Permit 74-72 Permit fee 10.00 Chapter 82. Public Property Article III. Use of Public Property Division 2. Revocable Permit 82-92(9) Application fee 1,000.00 Mailing fee, per address within 375 feet of subject property 0.50 Involving use of city property 3,000.00 82-95(b) Nonwaterfront property for single-family use, per square foot subject to permit 0.45 Maximum 7,500.00 Nonwaterfront property for multifamily or commercial use, per square foot subject to permit 0.90 Waterfront property, regardless of use, per square foot subject to the permit 1.25 Article IV. Use in Public Rights-of-Way Division 2. Temporary Obstructions 82-151(c)(4) Base fee 30.00 Plus, per lineal foot of street obstructed, per day 0.25 82-151(e) Applications for hearing 75.00 Division 3. Newsracks Subdivision II. Administration and Enforcement 82-204(a)(1) Release of stored newsrack 25.00 82-204(a)(2) Upon filing of a request for hearing 25.00 82-204(b) Reinspection fee 7.80 Subdivision III. Registration 82-231
(b)(3)aPer publisher, for any number of newsracks 7.68 82-231
(b)(3)bAt initial registration, per newsrack 7.80 Registration of at least 20 newsracks, per newsrack 3.90 Division 4. Pay Telephones Subdivision II. Permit 82-307(a) Annual fee for pay telephones provided by local exchange companies for local service only 370.00 82-307(b) Annual fee for all other pay telephones providers, for each pay telephone installed 650.00 Or, if a commission is paid to a private premises owner, an initial permit fee shall be paid of 250.00 Upon renewal, an additional permit fee shall be paid, equal to the difference between $650.00 and the commission paid to the private premises owner, plus $250.00 82-307(c) The first $250.00 of all annual permit fees shall be nonrefundable 82-307(d) Late payments, per month 25.00 Subdivision III. Regulations 82-341(j) Retroactive annual permit fee for existing pay telephones: Minimum 100.00 Maximum 650.00 Division 5. Sidewalk Cafes Subdivision II. Permit 82-382(b) Base application fee 150.00 82-383(a) Annual fee, per square foot of usable sidewalk area, including the area between the tables and chairs 25.00 82-384(ff) Application to design review or historic preservation board pertaining to the size of food display cases associated with sidewalk cafes and related restaurants 200.00 Chapter 86. Sales Article II. Garage Sales Division 2. Permit 86-56(b) Permit, each (for non-online application) 15.00 Article III. Nonprofit Vending and Distribution Division 2. Permit 86-173 Permit fee, per application, not less than 15.00 Chapter 90. Solid Waste Article III. Collection and Disposal Division 3. Rates, Charges, Billing Procedures 90-137(a) Single-family residences, per month* 45.33 Apartments, condominiums with less than nine dwelling units, per month per dwelling unit* 40.90 * The above rates for residential solid waste collection and disposal services will be subject to periodic adjustment as follows: • The solid waste collection portion of the rate shall be automatically adjusted, for the period covering the preceding fiscal year, annually, on January 1, according to the percentage increase or decrease in the consumer price index (CPI), of all urban consumers (CPI-U): U.S. city average, under the expenditure category entitled, "Garbage and trash collection (Unadjusted Percent Change)". The CPI adjustment for solid waste collection shall be subject to a maximum annual increase of three percent. • The solid waste disposal portion of the rate shall be automatically adjusted to reflect a pro-rata share of the city's actual pass-through costs for disposal of residential solid waste in a Miami-Dade County disposal site (i.e. to reflect any annual increase in the county's "tipping" fee). Article IV. Private Waste Collectors/Contractors Division 4. Specialty Contractors Subdivision II. Rolloff Waste Container Contractors 90-278(1) When rolloff is located in parking meter spaces, per meter, per day 5.00 90-278(6) Failure to timely pay license fee 50.00 Subdivision IV. Hazardous, Biohazardous Waste Containers 90-332(b) Annual fee, each permit 25.00 Chapter 98. Streets and Sidewalks Article III. Excavations Division 2. Permit Section
this CodeDescription
Amount
Ord. 2016-4065
(Effective
Dec. 24, 2016)98-92(c) (1) Street excavation permit: 50 lineal feet or less $362.95 Each additional lineal foot 3.05 (2) Sidewalk repair permit: 50 lineal feet or less 298.65 Each additional lineal foot 3.05 (3) Sidewalk construction permit: 50 lineal feet or less 298.65 Each additional lineal foot 3.05 (4) Paving or resurfacing of parkway or shoulder area permit: 25 lineal feet or less 298.65 Each additional lineal foot 6.48 (5) Landscaping, per tree 103.70 (6) Landscaping, bedding 103.70 (7) Building line and grade survey permit: 50 lineal feet or less 362.96 Each additional lineal foot 7.25 (8) Driveway construction permit, each driveway 129.62 (9) Flume excavation permit, each excavation 298.65 (10) Utility placement permit, poles, splice pits, manholes, hand holes, catch basins, pedestals, vaults and auger holes 298.65 Plus, for each additional, per block on same permit 14.51 (11) Underground utility service connection right-of-way excavation permit, each water, gas, electric, telephone, cable, television or sanitary sewer connection from base building line to the utility located within the public right-of-way 298.65 (12) Groundwater monitoring wells, each well 298.65 (13) Permit renewal fee: 90-day extension of permit fee expiration date 129.62 (14) After-the-fact permit fee. For any work described in (1) through (12), (16) and (17) herein, performed without proper permits and inspections, quadruple the fees (15) Reinspection fees. When additional inspection is required for work previously inspected and rejected by the department of public works, a reinspection fee will be required, for each reinspection 114.07 (16) Dewatering permit fee 362.95 (17) Blocking of right-of-way
Note: For major thoroughfares, full day permit is defined as five hours and 30 minutes between 10:00 a.m. and 3:30 p.m., pursuant to Resolution No. 2016-29583Standard review (full day permit) • Local road 320.43 • Collector road 427.24 • Major thoroughfares 1,000.00 Priority review (same day permit review) • Local road 384.51 • Collector road 512.27 • Major thoroughfare 1,000.00 Consecutive multi-day additional fee (per day)
For local and collector roads54.96 Consecutive multi-day additional fee (per day)
For major thoroughfares1,000.00 Partial day permit (4 hours or less) • Local road 159.69 • Collector road 213.62 Blocking right-of-way (all others) for local and collector roads: The greater of $0.25 per L.F. per day or $0.03 per S.F. per day) Blocking right-of-way (all others) for major thoroughfares: The greater of $2.50 per L.F., per day, or $0.30 per S.F. per day (18) Revocable permit Application fee, involving city property 4,148.00 Mailing fee, per address within 375 feet 0.51 (19) Coastal review 918.78 (20) Sewer capacity certification letter application 155.55 Section
this CodeDescription
Amount
98-93(a) Public Works review fee for a commercial building permit shall be assessed at .70% of the cost of construction 98-93(a) Public Works review fee for a residential building permit shall be assessed at .50% of the cost of construction 98-93(b) Double Fees for work prior to issuance of permit, plus penalties shall be consistent with subsection 14-61(b) 98-93(c)(1) Reinspection fees shall be consistent with subsection 14-61(c)(1) 98-93(d) Lost Plans fee shall be consistent with subsection 14-61(d). Planning shall not assess administrative processing fee 98-93(e) Revised Plans Review fee shall be consistent with subsection 14-61(e) 98-93(f) Lost Permit Card fee shall be consistent with subsection 14-61(f) 98-93(g) Inspection Fee hourly rate. As determined by the department at the beginning of each fiscal year 98-93(h) Plans re-review fee shall be consistent with subsection 14-61(h) 98-93(i) Expedited plans review and inspections in addition to all applicable fees Expedited plans review (not to exceed 4 hours) 500.00 Expedited inspection 150.00 98-93(l) Annual Adjustment of rates. The rates pertaining to this division will administratively adjusted annually to reflect increase(s) or decrease(s) in the Consumer Price Index for urban consumers, CPI-U 98-93(n) Phased Permit. If department review of Phase Permit application is required, a fee consistent with subsection 14-61(n) shall be assessed 98-94(a)(1), (2) Upfront Fee shall be consistent with subsection 14-62(a) 98-94(b) Refunds, time limitations, cancellations, change of contractors shall be processed and fees assessed consistent with subsection 14-62(b)(4), (5), (6), (7) 98-95 Certificate of occupancy or completion shall be processed and fees assessed consistent with subsection 14-66(1) 98-97 Employee training, education, safety and technology enhancements and other surcharge will be assessed consistent with subsection 14-69, 14-70(1), (2), (3), (5) as applicable 98-98(b) Documents. Requests for copies of department records, inspection reports, logs or other similar documents maintained by the department will be charged a fee consistent with subsection 14-61(d) 98-99 Interest and collection fees shall be charged for unpaid amounts (fees) due Minimum Public Works fee associated with a building permit 70.00 98-101 Temporary and special event fees Temporary platforms for public assembly, first approval 26.96 Temporary bleachers for public assembly, first approval 24.88 Tents up to 1,000 square feet per unit (excluding electric and plumbing) 26.96 Tents each additional 1,000 square feet over 1,000 per unit (excluding electric and plumbing) 17.62 Construction trailer, per trailer 26.96 Office trailer, per trailer 26.96 Temporary power for construction 26.96 Temporary toilet/outhouse 14.51 Chapter 102. Taxation Article IV. Resort Tax Division 4. Tax 102-310(b) Resort tax registration fee: At time of registration 25.00 If compelled to register because of failure or refusal to pay 100.00 102-311(h) Dishonored checks, the greater of: The charge paid by the city to the bank, plus 25% of the bank charge, minimum 5.00 5% of the amount of the check 102-314(f) Reporting fee: Initial late reporting fee 50.00 Plus, for each 30-day late period 25.00 Maximum 500.00 Article V. Occupational License Tax 102-384 Fee for hearing when licensee or permittee fails to comply with notice of violation or when requested by aggrieved applicant/licensee 75.00 Chapter 106. Traffic and Vehicles Article V. Police Vehicle Towing Division 2. Permit 106-216 Per vehicle tow 20.00 Article VI. Towing and Immobilization of Vehicles 106-269(c)(1)c Fee for removal of immobilization device, not to exceed 25.00 Chapter 110. Utilities Article III. Stormwater Utility 110-39(e) Meter test fees: (if meter found to be working properly) Up to 1 inch 50.00 1.5 to 2 inches 100.00 3 inches and greater 275.00 2nd Request within a 12-month period Up to 1 inch 75.00 1.5 to 2 inches 125.00 3 inches and greater 300.00 110-39(g) Unauthorized use of city water/meter tampering 100.00 Unauthorized use of city water/meter tampering (2nd occurrence) 200.00 Unauthorized use of city water/meter tampering (3rd occurrence and each subsequent occurrence). (In addition, the owner and/or consumer shall pay all costs associated with keeping the service off, including, but not limited to, all utility expenses, materials, cost of equipment, and reasonable attorney fees) 300.00 110-42(b) Unauthorized turn-on of service 100.00 Unauthorized turn-on of service (2nd occurrence) 200.00 Unauthorized turn-on of service (3rd occurrence and each subsequent occurrence). (In addition, the owner and/or consumer shall pay all costs associated with keeping the service off, including, but not limited to, all utility expenses, materials, cost of equipment, city labor costs, and reasonable attorney's fees and costs) 300.00 110-43(c) Turn-on fee 25.00 110-109(c) Stormwater utility service charge effective with billings on or after the following dates shall be as follows: October 1, 2000 3.25 October 1, 2001 4.00 October 1, 2002 5.50 October 1, 2003 5.80 October 1, 2004 5.80 October 1, 2005 5.80 October 1, 2008 7.42 October 1, 2009 9.06 October 1, 2014 16.67 October 1, 2016 22.67 October 1, 2017, plus CPI (Consumer Price Index pursuant to section 110-171(b)) 22.67 Article IV. Fees, Charges, Rates and Billing Procedure Division 2. Rates, Fees and Charges 110-166(a) Minimum service charge: Section
this CodeDescription
Amount
110-166(a)(1) Individual Metered Residential Service Base Facility Charge (per meter size) Rate ¾-inch ..... $7.82 1-inch ..... 8.16 1½-inch ..... 8.96 2-inch ..... 9.76 3-inch ..... 10.24 4-inch ..... 11.80 Water Consumption Charge (per 1,000 gallons) 0 to 8,000 Gallons ..... $0.90 8,001 to 16,000 Gallons ..... 2.48 16,001 to 24,000 Gallons ..... 3.69 Above 24,000 Gallons ..... 5.04 Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use ..... $1.93 110-166(a)(2) Master-Metered Multifamily Residential Service Base Facility Charge (per meter size) Rate ¾-inch ..... $7.82 1-inch ..... 16.88 1½-inch ..... 32.20 2-inch ..... 50.43 3-inch ..... 97.39 4-inch ..... 151.24 6-inch ..... 302.99 8-inch ..... 478.48 10-inch ..... 686.84 12-inch ..... 1,269.69 Water Consumption Charge (per 1,000 gallons) [*] Block 1 ..... $1.58 Block 2 ..... 2.70 Block 3 ..... 3.60 Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use ..... $1.93 [*] Usage blocks by meter size: Size of Meter Block 1
(gallons)Block 2
(gallons)Block 3
(gallons)¾-inch 0 to 16,000 16,001 to 32,000 Over 32,000 1-inch 0 to 40,000 40,001 to 80,000 Over 80,000 1.5-inch 0 to 80,000 80,001 to 160,000 Over 160,000 2-inch 0 to 128,000 128,001 to 256,000 Over 256,000 3-inch 0 to 256,000 256,001 to 512,000 Over 512,001 4-inch 0 to 400,000 400,001 to 800,000 Over 800,000 6-inch 0 to 800,000 800,001 to 1,600,000 Over 1,600,000 8-inch 0 to 1,280,000 1,280,001 to 2,560,000 Over 2,560,000 10-inch 0 to 1,840,000 1,840,001 to 3,680,000 Over 3,680,000 12-inch 0 to 3,440,000 3,440,001 to 6,880,000 Over 6,880,000 Section
this CodeDescription
Amount
110-166(a)(3) Nonresidential Service Base Facility Charge (per meter size) Rate ¾-inch ..... $7.82 1-inch ..... 16.88 1½-inch ..... 32.20 2-inch ..... 50.43 3-inch ..... 97.39 4-inch ..... 151.24 6-inch ..... 302.99 8-inch ..... 478.48 10-inch ..... 686.84 12-inch ..... 1,269.69 Water Consumption Charge (per 1,000 gallons) [*] Block 1 ..... 1.58 Block 2 ..... 2.70 Block 3 ..... 3.60 Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use ..... 1.93 [*] Usage blocks by meter size: Size of Meter Block 1
(gallons)Block 2
(gallons)Block 3
(gallons)¾-inch 0 to 16,000 16,001 to 32,000 Over 32,000 1-inch 0 to 40,000 40,001 to 80,000 Over 80,000 1.5-inch 0 to 80,000 80,001 to 160,000 Over 160,000 2-inch 0 to 128,000 128,001 to 256,000 Over 256,000 3-inch 0 to 256,000 256,001 to 512,000 Over 512,001 4-inch 0 to 400,000 400,001 to 800,000 Over 800,000 6-inch 0 to 800,000 800,001 to 1,600,000 Over 1,600,000 8-inch 0 to 1,280,000 1,280,001 to 2,560,000 Over 2,560,000 10-inch 0 to 1,840,000 1,840,001 to 3,680,000 Over 3,680,000 12-inch 0 to 3,400,000 3,440,001 to 6,880,000 Over 6,880,000 Section
this CodeDescription
Amount
110-166(a)(4) Individual Metered Residential Irrigation Service Base Facility Charge (per meter size) Rate ¾-inch ..... 7.82 1-inch ..... 8.16 1½-inch ..... 8.96 2-inch ..... 9.76 3-inch ..... 10.24 4-inch ..... 11.80 Water Consumption Charge (per 1,000 gallons) 0 to 16,000 Gallons ..... 2.47 Above 16,000 Gallons ..... 5.04 Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use ..... 1.93 110-166(a)(5) Master-Metered Multifamily Residential Irrigation Service Base Facility Charge (per meter size) Rate ¾-inch ..... 7.82 1-inch ..... 16.88 1½-inch ..... 32.20 2-inch ..... 50.43 3-inch ..... 97.39 4-inch ..... 151.24 6-inch ..... 302.99 8-inch ..... 478.48 10-inch ..... 686.84 12-inch ..... 1,269.69 Water Consumption Charge (per 1,000 gallons) [*] Block 1 ..... 2.47 Block 2 ..... 5.04 Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use ..... 1.93 [*] Usage blocks by meter size: Size of Meter Block 1
(gallons)Block 2
(gallons)¾-inch 0 to 32,000 Over 32,000 1-inch 0 to 80,000 Over 80,000 1.5-inch 0 to 160,000 Over 160,000 2-inch 0 to 256,000 Over 256,000 3-inch 0 to 512,000 Over 512,001 4-inch 0 to 800,000 Over 800,000 6-inch 0 to 1,600,000 Over 1,600,000 8-inch 0 to 2,560,000 Over 2,560,000 10-inch 0 to 3,680,000 Over 3,680,000 12-inch 0 to 6,880,000 Over 6,880,000 Section
this CodeDescription
Amount
110-166(a)(6) Nonresidential Irrigation Service Base Facility Charge leer meter size) Rate ¾-inch ..... 7.82 1-inch ..... 16.88 1½-inch ..... 32.20 2-inch ..... 50.43 3-inch ..... 97.39 4-inch ..... 151.24 6-inch ..... 302.99 8-inch ..... 478.48 10-inch ..... 686.84 12-inch ..... 1,269.69 Water Consumption Charge (per 1,000 gallons) [*] Block 1 ..... 2.47 Block 2 ..... 5.04 Purchased Water Pass-Through Rate (per 1,000 gallons) All Water Use ..... 1.93 [*] Usage blocks by meter size: Size of Meter Block 1
(gallons)Block 2
(gallons)¾-inch 0 to 32,000 Over 32,000 1-inch 0 to 80,000 Over 80,000 1.5-inch 0 to 160,000 Over 160,000 2-inch 0 to 256,000 Over 256,000 3-inch 0 to 512,000 Over 512,001 4-inch 0 to 800,000 Over 800,000 6-inch 0 to 1,600,000 Over 1,600,000 8-inch 0 to 2,560,000 Over 2,560,000 10-inch 0 to 3,680,000 Over 3,680,000 12-inch 0 to 6,880,000 Over 6,880,000 Section
this CodeDescription
Amount
110-166(f) Fire sprinkler system Rate Base Facility Charge (per meter size) 2-inch ..... 9.34 3-inch ..... 17.18 4-inch ..... 26.00 6-inch ..... 50.50 8-inch ..... 79.90 10-inch ..... 114.20 110-166(g) Tapping fee, per size of tap in inches: ¾-inch ..... 4,726.00 1-inch ..... 4,665.00 1½-inch ..... 5,106.00 2-inch ..... 5,116.00 3-inch ..... 5,627.00 4-inch ..... 6,189.00 6-inch ..... 6,808.00 110-166(g) Tapping fee, per size of tap in inches: ¾ ..... 4,726.00 1 ..... 4,665.00 1½ ..... 5,106.00 2 ..... 5,116.00 3 ..... 5,627.00 4 ..... 6,189.00 6 ..... 6,808.00 110-166(h) Guarantee of payment deposit, per service in inches: ¾ ..... 40.00 1 ..... 50.00 1½ ..... 60.00 2 ..... 100.00 3 ..... 500.00 4 ..... 600.00 6 ..... 1,000.00 8 ..... 1,500.00 110-166(i) Re-read fee (Charged if meter found to be working properly) 25.00 110-166(j) Special read fee 25.00 110-166(k) Servicing a meter found damaged, destroyed or missing will require actual replacement cost plus all costs associated with replacement of meter Actual costs 110-166(l) Field visit fee: Normal business hours 25.00 After normal business hours 50.00 110-167(a) Water impact fee, per meter size in inches: 5/8 ..... 155.00 ¾ ..... 230.00 1 ..... 385.00 1½ ..... 775.00 2 ..... 1,240.00 3 ..... 2,480.00 4 ..... 3,875.00 6 ..... 7,750.00 8 ..... 12,400.00 Larger than 8 inches, based on relative meter capacities 110-168(a)(1) Individual metered residential service: Base facility charge (all meter sizes) Rate All meter sizes ..... 8.45 Sewer consumption charge (per 1,000 gallons) All gallons (based on metered water consumption) ..... 4.26 Purchased sanitary sewer pass-through rate (per 1,000 gallons) All gallons (based on metered water consumption ..... 4.76 110-168(a)(2) Master-metered multifamily residential service: Base facility charge (per meter size) Rate ¾-inch ..... 8.45 1-inch ..... 18.88 1½-inch ..... 36.25 2-inch ..... 57.10 3-inch ..... 112.70 4-inch ..... 175.25 6-inch ..... 349.00 8-inch ..... 557.50 10-inch ..... 800.75 12-inch ..... 1,495.75 Sewer consumption charge (per 1,000 gallons): All gallons (based on metered water consumption) ..... 4.26 Purchased sanitary sewer pass-through rate (per 1,000 gallons): All gallons (based on metered water consumption) ..... 4.76 110-168(a)(3) Nonresidential service: Base facility charge (per meter size) Rate ¾-inch ..... 8.45 1-inch ..... 18.88 1½-inch ..... 36.25 2-inch ..... 57.10 3-inch ..... 112.70 4-inch ..... 175.25 6-inch ..... 349.00 8-inch ..... 557.50 10-inch ..... 800.75 12-inch ..... 1,495.75 Sewer consumption charge (per 1,000 gallons): All gallons (based on metered water consumption) ..... 4.26 Purchased sanitary sewer pass-through rate (per 1,000 gallons): All gallons (based on metered water consumption) ..... 4.76 110-169(a) Sewer impact fee, per meter size in inches: 5/8 ..... 235.00 ¾ ..... 350.00 1 ..... 585.00 1½ ..... 1,175.00 2 ..... 1,880.00 3 ..... 3,760.00 4 ..... 5,875.00 6 ..... 11,750.00 8 ..... 18,800.00 Larger than 8 inches, based on relative meter capacities 110-170(a) Submeter service inspection 50.00 Division 3. Billing Procedure 110-191(f) Dishonored checks, the larger of: Base fee 20.00 5% of the amount of the check 110-192(b) Disconnect charge (includes connecting after payment) (If disconnected for nonpayment all future payments must be made by ACH bank transfers or by a city accepted credit/debit card) 40.00 110-192(e) Unauthorized turn-on after disconnect 100.00 Unauthorized turn-on after disconnect (2nd occurrence) 200.00 Unauthorized turn-on after disconnect for cause (3rd occurrence and each subsequent occurrence) (In addition, the owner and/or consumer shall pay all costs associated with keeping the service off including, but not limited to, all utility expenses, materials, cost of equipment, city labor costs, and reasonable attorney's fees costs) 300.00 Subpart B. Land Development Regulations Chapter 118. Administration and Review Procedures 118-6 Cost recovery Review and Report by outside source TBD 118-7 Fees for the administration of land development regulations General Fees for Public Hearing Application for preliminary evaluation for public hearing 500.00 Application for public hearing. See Sec. 118-7 for applicable waivers 2,500.00 Fees for design review board or historic preservation board - For nonprofits proposing art in public places and/or non-commercial artistic murals, graphics and images Fee may be reduced by a 4/7 th affirmative vote of the city commission via resolution* * The nonprofit corporation must be in operation for a minimum of one year, must maintain its tax-exempt status in good standing with the Internal Revenue Service (IRS) and must provide access of its financial statements to the city, in order to assist the city commission in determining the economic viability and/or necessity for the waiver of fees. Application for clarification of previously approved board order 1,500.00 Application for amendment to an approved board order 2,500.00 Application for extensions of time of a previously approved board (non-administrative) 1,500.00 Application for after the fact approval 3 times original fee Advertisement (Additional fees may apply based on notice requirement for LDR. Comp. Plan and corresponding map amendments) 1,500.00 Mail Notice (per address) 4.00 Posting (per site) 100.00 Withdrawal or continuance prior to public hearing 500.00 Deferral of a public hearing 1,500.00 118-162(a), (b) Amendment of the Land Development Regulations, Zoning Map, Comprehensive Plan, and Future Land Use Map Amendment to the permitted, conditional or prohibited uses in a zoning category (per use) 2,500.00 Amendment to the permitted, conditional or prohibited uses in the comprehensive plan 2,500.00 Amendment to the zoning map designation (per square foot of lot area) up to 5,000 sq. ft. 0.50 Amendment to the zoning map designation (per square foot of lot area) 5,001 sq. ft. and greater 0.70 Amendment of future land use map of the comprehensive plan (per square foot of lot area) up to 5,000 sq. ft. 0.50 Amendment of future land use map of the comprehensive plan (per square foot of lot area) 5,001 sq. ft. and greater 0.70 Amendment to the land development regulations (per section being amended) 10,000.00 Amendment to the comprehensive plan (per goal, policy, or objective being amended) 10,000.00 118-193 Conditional Use Permit Application for conditional use permit for an assisted living facility (per bed) 100.00 118-253 Design Review Application for Design Review Board approval (per gross square foot of new construction) .50 118-321 Land/Lot Split See application fees under General Fees 118-353 Variances Per variance requested—See section 118-7 for applicable waivers 500.00 118-562, 118-564 Certificate of Appropriateness Application for COA (per gross square foot of new construction) .50 118-591 Historic Designation Application for district designation (per platted lot) 100.00 Planning Director determination of architectural significance (142-108) 2,500.00 Staff Review and Miscellaneous Fees Preliminary zoning review (Dry Run) up to 5,000 sq. ft. 2,500.00 Preliminary zoning review (Dry Run) per square foot fee beyond 5,000 sq. ft. 0.50 Board Order Recording up to 10 pages (11+ pages will be assessed a per page fee) 100.00 Status Reports 1,000.00 Progress Reports 2,500.00 Failure to appear before a board for Status or Progress Report 2,500.00 Zoning Verification letter (per address or folio - includes 1 hour of research) 250.00 Zoning Interpretation Letter 1,000.00 Research per hour fee (beyond four hours per submittal) 150.00 Excessive Review per hour fee (beyond four hours per submittal) 150.00 Review of Covenants or Easement 5,000.00 Modification or release of Covenants or Easement 2,500.00 Courier (per package) 10.00 Recording fee (up to 10 pages) 100.00 Per page recording fee (beyond 10 pages) 10.00 Paint permit (non-online applications) 75.00 Signs (not requiring a building permit) 75.00 Hard copy (paper) submittal conversion of documents to electronic format shall be charged at city's cost from vendor TBD Chapter 130. Off-Street Parking Article V. Parking Impact Fee Program 130-132(a), (b)(2) Fee in Lieu of Parking One Time Fee 40,000.00 Yearly Fee 800.00 Article VII. Surplus and Under-Utilized Parking Spaces 130-192 Lease of under-utilized parking spaces, application fee 215.00 Additional fee regarding application for lease of under-utilized parking spaces, per space 6.00 Chapter 138. Signs Article IV. Temporary Signs 138-131(d) Maximum amount of bond for temporary signs 6 square feet or larger 300.00 138-135(e)(5) Permit for real estate sign in single-family residential districts, non-online applications, per primary sign 10.00 138-136(e)(5) Permit fee for real estate signs for multifamily, commercial, industrial, vacant land (other than residential), non-online applications, per sign 25.00 138-137(e) Minimum bond amount for temporary balloon signs 500.00 Chapter 142. Zoning Districts and Regulations Article II. District Regulations Division 18. PS Performance Standard District 142-704(4) In-lieu-of payment for open space requirement, per square foot of open space not provided 5.00
(Ord. No. 98-3136, § 1, 9-23-98; Ord. No. 98-3155, § 3, 11-18-98; Ord. No. 99-3205, § 1, 9-17-99; Ord. No. 99-3207, 9-22-99; Ord. No. 2000-3261, § 1, 7-26-00; Ord. No. 2000-3262, § 6, 7-26-00; Ord. No. 2000-3274, § 1, 10-18-00; Ord. No. 2000-3279, § 1, 11-8-00; Ord. No. 2001-3325, § 3, 10-17-01; Ord. No. 2001-3342, § 1, 12-19-01; Ord. No. 2002-3360, § 2, 4-10-02; Ord. No. 2002-3382, § 1, 9-26-02; Ord. No. 2002-3387, § 3, 12-11-02; Ord. No. 2003-3420, 7-30-03; Ord. No. 2003-3421, § 2, 7-30-03; Ord. No. 2003-3422, § 2, 7-30-03; Ord. No. 2003-3423, § 2, 7-30-03; Ord. No. 2003-3425, § 2, 9-18-03; Ord. No. 2003-3426, § 2, 9-18-03; Ord. No. 2003-3427, § 1, 9-18-03; Ord. No. 2006-3538, § 1, 10-11-06; Ord. No. 2007-3580, § 2, 10-17-07; Ord. No. 3581, § 1, 10-17-07; Ord. No. 2008-36-14, § 2, 9-17-08; Ord. No. 2008-3615, § 1, 9-17-08; Ord. No. 2009-3652, § 1, 9-24-09; Ord. No. 2009-3653, § 3, 9-24-09; Ord. No. 2010-3670, § 3, 1-13-10; Ord. No. 2010-3671, § 2, 1-13-10; Ord. No. 2010-3672, § 3, 1-13-10; Ord. No. 2010-3673, § 2, 1-13-10; Ord. No. 2010-3698, § 1, 9-20-10; Ord. No. 2010-3699, § 1, 10-27-10; Ord. No. 2011-3732, § 8, 9-14-11; Ord. No. 2011-3733, § 2, 9-14-11; Ord. No. 2011-3734, § 2, 9-14-11; Ord. No. 2011-3735, § 2, 9-14-11; Ord. No. 2012-3776, § 3, 9-27-12; Ord. No. 2012-3777, § 2, 9-27-12; Ord. No. 2012-3778, § 3, 9-27-12; Ord. No. 2012-3779, § 2, 9-27-12; Ord. No. 2013-3816, § 1, 9-30-13; Ord. No. 2014-3845, § 3, 3-5-14; Ord. No. 2014-3846, § 1, 3-5-14; Ord. No. 2014-3894, § 1, 9-10-14; Ord. No. 2014-3898, § 2, 9-30-14; Ord. No. 2015-3967, § 1, 9-30-15; Ord. No. 2015-3979, § 1(Exh. A), 12-9-15; Ord. No. 2016-4039, § 2, 9-27-16; Ord. No. 2016-4040, § 1, 9-27-16; Memo of 10-26-16; Ord. No. 2016-4065, § 1, 12-14-16; Ord. No. 2017-4130, § 3, 9-25-17; Ord. No. 2017-4145, § 2, 10-18-17; Ord. No. 2017-4145, 12-13-17; Ord. No. 2018-4175, § 2, 3-7-18; Ord. No. 2018-4176, § 1, 3-7-18; Ord. No. 2018-4214, § 2, 9-26-18; Ord. No. 2018-4215, § 2, 9-26-18; Ord. No. 2019-4240, § 2, 2-13-19)